This is the path Wonhwa Precision Co., Ltd. has walked on.
- 2023
- - Mass-produced GM GF/GH OIL PIPE
- 2022
- - Mass-produced GM CSS675T OIL PIPE
- 2021
- - Mass-produced commercial G/F Engine (EURO6) EGR PIPE
- 2020
- - Approved for the 2-Plant SQ Multi-Plant Certification
- - Mass-produced FORD P703 EGR Pipe
- - Mass-produced LAMDA3 Engine OIL PIPE
- 2019
- - Mass-produced Theta3 engine EGR PIPE
- - Mass-produced NEW-R Engine EGR & OIL PIPE
- - Mass-produced improved Kappa Engine ADAPTOR PIPE
- 2018
- - Mass-produced Gamma2 OIL PIPE & ADAPTOR
- - Mass-produced GM CSS Oil Feed Pipe
- - Completed the Sungminwonhwa Plant in China
- 2017
- - Mass-produced Ford Maverick FWD Bellows Pipe
- - Mass-produced Ford Lion F150 EGR Pipe
- - Screened for GM BIQS (10.12)
- - Completed 2 plants (Daegu National Industrial Complex) (12.28)
- 2016
- - Mass-produced Ford Coolant PIPE
- 2015
- - Mass-produced Kappa, Lambda2 Engine EGR & OIL PIPE
- - Mass-produced Gamma, U2 EURO-6 EGR & OIL PIPE
- 2014
- - Mass-produced EURO-6 EGR & OIL PIPE
- - Mass-produced GM SGE BYPASS PIPE
- - Mass-produced PSA EGR PIPE
- 2013
- - Established the Corporate Research Institute
- - Acquired the ISO/TS 16949 certification
- 2011
- - Awarded the Technology Development Innovation (SMBA)
- - Expanded and relocated to the Seongseo 5th Industrial Complex
- - Converted the corporation to Wonhwa Precision Co., Ltd.
- 2010
- - Mass-produced EURO-5 & OIL PIPE
- 2000~2009
- - Acquired the Hyundai・Kia Motor SQ Certification (welding)
- - Established the line-up for EGR & OIL PIPE mass production
- - Acquired the ISO 9001 Certification
- - Acquired the ISO 14001 Certification
- 1989
- - Established the Company (Wonhwa Precision)